CTS provides Testing, Adjusting, and Balancing (TAB) for HVAC air systems and hydronic water systems across British Columbia. Explore our two core service areas below.
Air Balancing
Our HVAC TAB work tests and adjusts supply, return, exhaust and outdoor airflow to help HVAC systems meet the project’s specified design air quantities. Our work covers air-handling equipment, duct branches and terminal devices within the agreed scope.
Air measurements and adjustments
- Measure airflow at diffusers, grilles, registers and exhaust terminals.
- Verify fan and air-handling unit airflow, static pressure and relevant operating conditions.
- Adjust dampers, VAV terminals and fan settings as applicable, in coordination with the project team.
- Investigate airflow shortfalls, distribution issues and pressure relationships where specified.
Measured airflow is compared with design values. Equipment, ductwork or control limitations that prevent the required results are documented for correction.
Before air balancing
Provide mechanical drawings and design air quantities. Fans, filters, ductwork, dampers and terminal devices should be installed and accessible, with controls ready to demonstrate the required operating modes.
Water Balancing
Our Hydronic TAB work tests and adjusts water flow in hydronic heating and cooling systems so coils, branches and equipment receive their specified design flow rates. Domestic hot water recirculation (DHWR) is a separate potable-water system. CTS can include DHWR balancing when it is part of the project scope.
Water measurements and adjustments
- Measure water flow using balancing-valve differential pressure or suitable ultrasonic instruments where conditions permit.
- Verify pump operating conditions, differential pressure and relevant water temperatures.
- Adjust balancing valves and coordinate pump speeds or control settings with the project team.
- Investigate low-flow, excess-flow and distribution issues in branches and terminal equipment.
Flow measurements are evaluated against design requirements and the applicable valve or equipment data. System readiness, fluid conditions and installation constraints are considered and unresolved deficiencies are recorded.
Before water balancing
Provide piping drawings, design flow rates and applicable valve or equipment data. The system should be filled, vented and ready to operate, with pumps, valves and controls accessible. Confirm readiness and measurement requirements with CTS.
What TAB Helps Verify
TAB checks airflow and water-flow distribution against project requirements, helps identify operating deficiencies and supports system comfort and performance.
What affects the results?
Results depend on system design, equipment condition, controls and corrective work. TAB alone does not guarantee energy savings or resolve every comfort issue.